spot_img
spot_img
spot_img
Sunday, September 15, 2024
spot_img
spot_img
spot_img

Latest Posts

Guwahati Issues New Traffic Advisory for Cycle Factory Flyover Construction

spot_img
spot_img
spot_img
- Advertisement -

To facilitate the extension of the Cycle Factory Flyover from Cycle Factory to Barsapara Junction, the Guwahati Traffic Police has issued a fresh advisory outlining significant changes to traffic routes and regulations. These measures, effective from August 19, 2024, aim to manage vehicular movement and ensure public safety during the ongoing construction.

Key Route Changes and Traffic Regulations

In the advisory, several critical adjustments have been highlighted to accommodate the construction work and minimize disruption to daily commutes:

  1. One-Way on Birubari Tiniali to Barsapara Tiniali Stretch:
    • The stretch between Birubari Tiniali point and Barsapara Tiniali will operate as a one-way road. Vehicles coming from Arya Nagar/Birubari Tiniali will be permitted to travel towards Barsapara Tiniali only. This measure is intended to streamline traffic flow and reduce congestion during the flyover’s foundation work.
  2. Partial Opening for Two-Way:
    • Upon completion of the initial construction phase, a portion of the aforementioned stretch will be reopened to allow both-way traffic between Birubari Tiniali point and Cycle Factory point. This phased reopening is designed to ease travel conditions as the project progresses.
  3. Diversion for Vehicles from Lalganesh Side:
    • Vehicles approaching the Cycle Factory from the Lalganesh side will face a diversion at Barsapara Tiniali point. Vehicles will be redirected via Kula Basumatary Road, in front of ACA Stadium, Barsapara, towards Dhirenpara Tiniali on A.K. Dev Road. From there, motorists can either take a left turn towards NH-27 or a right turn towards Ambari Tiniali/Fatasil Chariali, depending on their destination.
Traffic Advisory

Public Cooperation and Safety Measures

The Guwahati Traffic Police urges residents and commuters to cooperate with the new regulations to ensure smooth traffic flow and avoid any inconvenience. The advisory emphasizes the importance of adhering to the designated routes and being vigilant about the ongoing construction activities in the area.

These changes are set to remain in effect until further notice, and the authorities have assured the public that efforts will be made to minimize disruption and complete the construction in a timely manner.

Looking Ahead

The Cycle Factory Flyover extension is a crucial infrastructure project aimed at improving connectivity and reducing traffic congestion in Guwahati. The completion of this project is expected to enhance transportation efficiency, providing long-term benefits for the city’s residents.

For now, motorists are encouraged to plan their routes accordingly, allowing extra travel time and following the traffic advisories to navigate the temporary changes. Regular updates will be provided by the Guwahati Traffic Police as the construction progresses, ensuring that the public remains informed and prepared for any further adjustments.

Also read: Viral Video Exposes Assam Police Misconduct at Independence Day Rally: Public Outcry Ensues

spot_img
spot_img

Latest Posts

spot_imgspot_img

Don't Miss

spot_imgspot_img